Risk Management Plan
Risk ID |
Description |
Severity |
Probability |
Mitigation Plan |
RIS001 |
Delay in setting up the Dockerized environment and integration with MariaDB |
High |
Medium |
Establish clear setup guidelines, assign an experienced team member to lead the configuration, and schedule early testing to catch issues promptly. |
RIS002 |
Inadequate security measures leading to vulnerabilities in the service |
High |
Low |
Conduct regular vulnerability scanning, adhere to industry security standards, and incorporate a review process for security-critical changes. |
RIS003 |
Scope creep due to additional feature requests or changes in project requirements |
Medium |
Medium |
Implement a change management process (see Section 4.2) and hold regular review meetings to reassess priorities and ensure scope alignment. |
RIS004 |
Insufficient documentation updates causing miscommunication and version control issues |
Medium |
Medium |
Enforce strict documentation guidelines, assign a dedicated documentation lead, and schedule periodic audits of the GitLab repository. |
RIS005 |
Resource constraints, such as team availability or hardware limitations affecting project progress |
High |
Low |
Plan resource allocation in advance, build in buffer time for potential delays, and consider external support if necessary. |
RIS006 |
Integration challenges with third-party services (e.g., payment gateways, version control systems) |
Medium |
Medium |
Maintain close communication with third-party vendors, use standardized APIs, and include contingency time in the schedule for integration testing. |
RIS007 |
Communication breakdown within the project team or with stakeholders |
Medium |
Low |
Establish clear communication channels and regular status meetings; utilize collaborative tools (e.g., Slack, Discord) to keep everyone aligned. |
Severity descriptions
The severity class should be defined according the project
Probability \ Severity |
Critical |
High |
Medium |
Low |
Very Low |
Very High |
1 |
1 |
2 |
3 |
4 |
High |
1 |
2 |
3 |
4 |
4 |
Medium |
2 |
3 |
3 |
4 |
5 |
Low |
3 |
3 |
4 |
4 |
5 |
Very Low |
4 |
4 |
4 |
5 |
5 |
- 1: Critical – Immediate action required.
- 2: High – Urgent action needed.
- 3: Medium – Action required to mitigate risk.
- 4: Low – Acceptable risk with some monitoring.
- 5: Very Low – Negligible risk, no immediate action required.
Probability \ Severity |
Critical |
High |
Medium |
Low |
Very Low |
Very High |
1 |
1 |
2 |
3 |
4 |
High |
1 |
2 |
3 |
4 |
4 |
Medium |
2 |
3 (RIS001) |
3 (RIS003, RIS004, RIS006) |
4 |
5 |
Low |
3 |
3 (RIS002, RIS005) |
4 (RIS007) |
4 |
5 |
Very Low |
4 |
4 |
4 |
5 |
5 |